Reduction in Rework Rates
Industry: Oil & Gas
Duration: 12 months
Location: Houston, TX
Value: Unlocked $10M in annual revenue
Situation
Rework rate for a production line was consistently 36%. One rework cycle effectively doubled lead time and consumed capacity.
Approach
Trained Quality personnel in Lean Six Sigma methodologies
Applied continuous improvement to Quality functions
Applied problem solving techniques to reduce/eliminate defects in manufacturing
Results
Reduced rework rates from 36% to 7.6% in 12 months, then stabilized at 3.4%
Released manufacturing capacity from excessive rework streams
Unlocked $10M in annual revenue opportunity