Reduction in Rework Rates

Industry: Oil & Gas
Duration: 12 months
Location: Houston, TX
Value: Unlocked $10M in annual revenue

Situation

Rework rate for a production line was consistently 36%. One rework cycle effectively doubled lead time and consumed capacity.

Approach

  • Trained Quality personnel in Lean Six Sigma methodologies

  • Applied continuous improvement to Quality functions

  • Applied problem solving techniques to reduce/eliminate defects in manufacturing

Results

  • Reduced rework rates from 36% to 7.6% in 12 months, then stabilized at 3.4%

  • Released manufacturing capacity from excessive rework streams

  • Unlocked $10M in annual revenue opportunity

Previous
Previous

$960k Annual Margin Improvement