Reducing Rebuild Lead Time for Drilling Equipment to Expedite Return to Drilling Sites

Industry: Oilfield Services
Duration: 4 months
Locations: Midland & Conroe, TX
Value Created: Lead times down from weeks to days

Situation

Drilling equipment rebuild lead times were unpredictable and excessively long, limiting tool availability and slowing field operations. Logistics were inconsistent, rework was common, and teams lacked visibility into flow performance.

Approach

  • Conducted full value‑stream mapping across both sites

  • Implemented TPM in Midland to reduce downtime

  • Redesigned Conroe’s shop layout for optimized flow

  • Streamlined logistics and replenishment

  • Introduced daily tier meetings and KPI hierarchy

  • Coached practitioners to sustain improvements independently

Results

  • 85% reduction in total relining lead time

  • Increased tool availability and field responsiveness

  • Lower rework rates and clearer root‑cause tracking

  • Improved decision cycles through visible metrics